Sectors | Power, grid and energisation
Power and grid leadership search across the GCC, the UK and the US.
A data centre takes three to six years; the grid behind it can take fifteen. I find the power and energisation leaders who set the date.
Seats like these open quietly. Open to a move? Talk to me in confidence.
Not ready to brief? Get a pay benchmark for your open seats
A benchmark of your open seats carries no fee. A full compensation study is a fixed-fee piece, credited against a search.
Last reviewed , the date of the market facts on this page.
Looking at your next move? See this page for leaders
Hiring for one of these seats? See this page for clients
The seats
- Head of power and energy for data centre developers and operators
- Head of grid connections, energisation director
- HV, substation and transmission programme directors
- Head of HVDC and interconnector delivery
- On-site generation, storage and battery leads for campuses
- Utility-side programme and commercial leaders for large-load connections
What is driving hiring, and the timelines
- Grid is the binding constraint. New grid takes 5 to 15 years against 3 to 6 for a data centre, and grid spend of about USD 400bn a year must approach generation spend of about USD 1tn by the early 2030s (IEA, World Energy Investment 2025).
- The UK spend is set. Ofgem's RIIO-3 final determinations allow GBP 43.3bn ex ante from April 2026 to March 2031, with more through uncertainty mechanisms (Oxera; Ofgem).
- The US and the Gulf are funding transmission. US investor-owned utilities plan more than USD 1.1tn for 2025 to 2029 (Edison Electric Institute). Saudi Electricity has set out SR220bn (USD 58.7bn) for 2025 to 2030, SR135bn of it for transmission (MEED).
Where I find them
I built a retained desk for renewables and storage across Germany, Austria and Switzerland, then ran energy and EPC search across the Middle East.
Questions clients ask
- Do you cover utilities as well as data centre firms?
- Yes, for the leadership seats on large-load and transmission programmes. The same people move between the two sides.
Retained search. A fee on signing, a shortlist date in writing, the balance on the start date, a six-month replacement. The terms
Brief me on a power, grid and energisation seat
The more you tell me, the more useful my first reply. I'll come back within one working day.
Thank you. The brief is with me.
I will come back within one working day with times.
Other seats open? Get a pay benchmark for them.
Seats I search for in this family
- Head of power and energy for data centre developers and operators
- Head of grid connections, energisation director
- HV, substation and transmission programme directors
- Head of HVDC and interconnector delivery
- On-site generation, storage and battery leads for campuses
- Utility-side programme and commercial leaders for large-load connections
Most of these searches are confidential and never advertised. Published ones are on the careers page.
What they pay
| Seat | Published pay | Source |
|---|---|---|
| Programme director, transmission and distribution, UK | GBP 140,000 to 175,000 a year | Published figure: LSP Renewables, 2026 |
| Project director, transmission and distribution, UK | GBP 110,000 to 145,000 a year | Published figure: LSP Renewables, 2026 |
| Grid connections director, UK | Up to GBP 125,000 a year | Published figure: Piper Maddox, job advert |
Published figures from the sources named, not my own data. Base pay unless stated; Gulf packages usually add housing, transport and schooling. For your own seat, ask for a confidential market check.
How a confidential conversation works
- A call, not a form. What you run today, what you would move for, and what you would not.
- Nothing shared without your say-so. Your profile goes to a client only with your permission for that one role.
- The real package, in writing, before you interview: base, housing, schooling, bonus and relocation.
- The move handled: notice, visas and family questions, into or out of the Gulf.
- You never pay a fee.
Register and share your CV
I read every profile myself. If a power, grid and energisation seat fits, I'll call you; if not, I'll keep you in mind, only with your permission.
Thank you. You're registered.
If this is a conversation worth having, I will send times within one working day; either way your details are held privately.
Want to know what your seat pays elsewhere? Ask for a confidential market check.
An energisation date that depends on one hire?
Tell me the seat and the date. Not ready to brief? Ask for a pay benchmark for your open seats.
Open to the right move?
Register in confidence, or ask what your seat pays elsewhere.